Minimized downtime with efficient on-site cleaning.
Annual maintenance cleaning for industrial production equipment.
The Challenge
Production line needed cleaning without full disassembly.
Our Solution
Dry ice blasting allowed in-place cleaning during scheduled maintenance window.
The Results
Equipment back online in 48 hours vs. typical 1-week downtime.
